Enterprise Manufacturing Management

From bill of materials to finished goods, costed and traceable.

Engineering data, material planning, shop-floor execution, quality and costing run on the same inventory and ledger the rest of the enterprise uses — so production decisions are made with commercial and financial context.

COOManufacturing DirectorPlant Controller
Manufacturing / WO-2026-0334Sample data

Multi-level bill of materials

Rev C
  • PA-200 Pump assembly1 eaFinished good
  • SA-12 Motor housing1 eaSub-assembly
  • RM-311 Aluminium casting2.4 kgRaw material
  • RM-118 Bearing 62042 eaRaw material
  • SA-07 Impeller set1 eaSub-assembly
  • RM-502 Polymer resin0.8 kgRaw material

Work order WO-2026-0334

Output completed64%
Material issued88%
  • Planned quantity500 ea
  • Finished goods received320 ea
  • Quality inspectionPassed

Material consumption — required vs issued

RequiredIssued
Sample data
PeriodRequiredIssued
RM-31112001180
RM-11810001000
RM-502400352
RM-640250250
PK-020500320
01

Engineering and planning

Multi-level BOMs, routings, work centres and MRP-driven planned orders, scheduled against work-centre calendars and planned downtime.

02

Shop-floor execution

Work orders, material issue, consumption, machine time, subcontracting, quality inspection and finished-goods receipt with batch and serial capture.

03

Cost and control

Production cost rolls into finished goods, WIP is reconciled to the ledger, and manufacturing reports show output and consumption by order.

Capability register

What manufacturing includes — and what it does not yet.

Every capability is marked by status. Roadmap items are never marketed as available.

Available14Scoped6Roadmap3
Available Implemented in the platform today.Scoped Implemented with the scope described in the note.Roadmap Not yet implemented. Scoped and prioritised with customers.

Engineering and planning

  • Bill of MaterialsAvailable
  • Multi-Level BOMAvailable
  • Routings and Work CentresAvailable
  • Production PlanningAvailable

    MRP-driven planned orders.

  • Production SchedulingAvailable

    Scheduling against work-centre calendars and downtime.

  • Capacity PlanningScoped

    Work-centre availability in scheduling; no finite-capacity optimiser.

Execution

  • Work Orders / Production OrdersAvailable
  • Raw Material ManagementAvailable
  • Material Issue and ConsumptionAvailable
  • Work in ProgressAvailable

    WIP tracked and reconciled to the ledger.

  • Finished Goods ReceiptAvailable
  • SubcontractingAvailable

    Material sent to job-work vendors tracked as externally-held stock.

  • Machine Time RecordingAvailable
  • Quality ManagementAvailable

    Quality inspections at receipt and production.

  • Scrap and WastageScoped

    Recorded through production execution and stock adjustments.

Costing and analytics

  • Manufacturing CostingScoped

    Material and production cost roll-up into finished goods.

  • Production VarianceScoped

    Planned versus actual quantities; financial variance analysis is roadmap.

  • Production ReportingAvailable
  • Manufacturing AnalyticsScoped

    Manufacturing reports and WIP reconciliation.

  • Equipment ManagementScoped

    Work centres and machine time; no asset-maintenance link.

  • Maintenance ManagementRoadmap
  • Manufacturing Execution System (MES)Roadmap
  • Advanced Planning and Scheduling (APS)Roadmap

Connected workflows

Where manufacturing sits in the end-to-end process.

Plan-to-Produce

Process owners: COO · Manufacturing Director

Demand is exploded through multi-level bills of materials into planned purchase and production, then executed, inspected and costed on the shop floor.

  1. Production Planning

    MRP nets requirements against on-hand stock, open purchase orders and open production.

  2. Material Requirements

    Multi-level BOM explosion using low-level codes produces planned orders.

  3. Scheduling

    Work orders are scheduled against work-centre calendars and downtime.

  4. Material Issue

    Raw materials are issued from warehouse to production, or to subcontractors.

  5. Production & WIP

    Execution records quantities, machine time and consumption; WIP is tracked and reconciled.

  6. Quality Inspection

    Output is inspected before it becomes saleable stock.

  7. Finished Goods

    Finished goods are received into stock with batch or serial traceability.

  8. Costing

    Material and production cost roll into finished-goods value.

    Financial variance analysis is on the roadmap.
  • Material shortages visible before they stop a line
  • Forward and backward batch traceability
  • WIP that agrees with the ledger

Procure-to-Pay

Process owners: CPO · CFO · Supply Chain Director

Spend is committed only after it is requested, approved, competitively quoted and ordered — and paid only after what was ordered, received and billed agree.

  1. Purchase Requisition

    Departments raise requisitions against products or services, tagged to branch and warehouse.

  2. Approval

    Purchasing approval rules route the requisition; delegation keeps approvals moving when an approver is away.

  3. Request for Quotation

    Approved demand is sent to multiple suppliers.

  4. Quotation Comparison

    Supplier responses are compared on price, terms and lead time before award.

  5. Purchase Order

    The awarded quotation becomes a purchase order with charges, taxes and payment terms.

  6. Gate Entry & Goods Receipt

    Arrivals are logged at the gate, inspected and received into a specific warehouse location, batch or serial.

  7. Three-Way Match

    Purchase order, goods receipt and vendor bill are matched; exceptions are held before payment.

  8. Vendor Payment

    Payments are scheduled and settled against matched bills.

  9. General Ledger

    Inventory, GRNI, payables and bank postings are generated automatically.

  • No payment without a matched receipt
  • Full audit chain from requisition to ledger
  • Visible GRNI and supplier balances at any date

Questions

Answers for leadership.

MRP nets multi-level requirements against on-hand stock, open purchase orders and open production, and proposes planned orders for whatever is still short.

Discuss your manufacturing requirements.

Tell us how your business works. We’ll show you the modules that fit, using examples from your own invoices and stock.